roomraider
Best Topic Starter
In an interesting development plans for an Intamin standup on the site of Nemesis have been revealed.
These were plans from the 90s for the site that ended up housing Nemesis and it appears these were the unbuilt SW2, with SW1 being the better known Arrow Pipeline project and SW3 ending up being Nemesis
They appeared during the (new?) Archives Unlocked tour at the park and offer a facinating insight into what could have been
I can't say anyone will be unhappy with the switch to the ride we got as this ride looks short, with an extensive pre-lift and just the one inversion.
You have to wonder if AT got wind of Draytons plans for Shockwave due to open the same year and pivoted to a new design.



Source: Coastertog on FB
These were plans from the 90s for the site that ended up housing Nemesis and it appears these were the unbuilt SW2, with SW1 being the better known Arrow Pipeline project and SW3 ending up being Nemesis
They appeared during the (new?) Archives Unlocked tour at the park and offer a facinating insight into what could have been
I can't say anyone will be unhappy with the switch to the ride we got as this ride looks short, with an extensive pre-lift and just the one inversion.
You have to wonder if AT got wind of Draytons plans for Shockwave due to open the same year and pivoted to a new design.



Source: Coastertog on FB