Agreed. I wasn't sure how it would look, but that's really grown on me. It looks much better with the 'real' 3D relief of on it, rather than the 2D printed graphics. I think that might be what makes it look so much better.I absolutely love the sign! Wasnt too sure about the logo when it was first released but now that it's up in front of the coaster itself....yeah, looks awesome.
I spotted a point just before the downward spiral which looked a little dead and the big deadspot just before the last airtime hill before the brakes. That's the main one, it's one of those where the ride should be ending as the speed is nearly gone but somehow they sneak in an airtime hill before the end.Just out of curiosity, which sections on IG are believed to be the dead spots?
Everyone said that about Zadra, and they managed it with that ride! I also remember Wildfire at Kolmarden having a similarly tight pre-opening schedule, so it definitely seems to be a bit of a trend with RMCs!That doesn't seem right. They haven't even finished the trackwork yet, let alone testing... I really doubt they can accomplish all that in one month.
Sent from my Redmi Note 7 using Tapatalk
Neither of those had to contend with American regulations though. However, sea world has been doing really well with quick construction so since I'll be there at the end of March, I'm certainly pulling for it to happen in time. Knowing my luck though, it will open the next week.Everyone said that about Zadra, and they managed it with that ride! I also remember Wildfire at Kolmarden having a similarly tight pre-opening schedule, so it definitely seems to be a bit of a trend with RMCs!
Everybody (myself included) said they wouldn’t open Zadra by the first date floating around, as it left only a week or 2 for testing... We were right, it didn’t open by that date! It opened later (although granted, not a lot later, was it a week or 2?)Everyone said that about Zadra, and they managed it with that ride! I also remember Wildfire at Kolmarden having a similarly tight pre-opening schedule, so it definitely seems to be a bit of a trend with RMCs!
They could have used an up-to-date construction photo