Okay, so a little bit late, but most of this hasn't been posted anywhere else, soooo... a new update, by yours truly! This was on Thursday, from around ten thirty to noon.
So, they were laying sod down around the hop over the skyride:
The first train was on the brake run at this point:
And they were working on stuff there:
When I came back here later, the train was gone and I think was sitting on the third launch.
They took the work walls down from the bridge to Edge of Africa over the coaster and put up nets:
While in the area, I saw Mark Rose (the VP of design and engineering) talking with some other people in hardhats. They then went to check on stuff:
Now on to the station area:
Continuing on the concrete for the plaza:
They had taken down the work walls on the lower deck as well, and were painting the fence:
The station building, with continued work on the "driftwood" statues:
More work with various poles and other theming elements:
Work on what may be a snack stand or something:
Foliage going in place, it really adds to the area:
And, finally, a new sign for the skyride:
I think later in the day they were testing around the whole circuit, I must have left before that though.