I'm very sure that this will be a fun ride, but I can't help feel that it may have been the wrong choice for Chessington. It's to do with the fact that Chessington is a very highly trafficked park (guest number wise), and what did they choose to purchase for it? a single train shuttle coaster!
It's quite silly I feel. I'm sure they'll do all they can to keep the throughput as high as they can, but you can only do so much with what you're given. You just know that the majority of the time, that train is going to be sat stationary in the station to allow guests to embark and disembark. A two-train operation really would help matters as when one train is dispatched, a second can start to be loaded, reducing the stationary time. BUT, this is ONLY suitable if the track length (out and back) is sufficiently long enough AND they build the infrastructure to allow multiple trains (eg, a sliding track or a switch track system). I am looking forward to riding it but overall feel it's the wrong choice for a park like Chessington. The flat rides will only do so much.
The wing coaster at Legoland Deutschland looks a much more solid ride.
Sorry, will stop being grumpy now.
As I said above, I will 100% go and ride it and i'll be the first to reverse course on my comments after i've ridden and experienced it.