TheCoasterCruiser
Giga Poster
I just want to clarify, that the planning approval you speak of were never meant to be taken as a literal 5-year plan for the park. It’s more of a “if they want to do this, they now can” sort of thing. And so, everything in there should be taken with a pinch of salt. For instance, according to the documents, the park should have gotten a drop tower in 2019, but instead they got the Intamin Gyro Swing. The documents also mention a steel coaster with a height of 30-35 meters for 2020, but that certainly didn’t happen either.