You mean about how smooth the SLC is? ?
You mean about how smooth the SLC is? ?
Polish heath and safety rules for you I guess..That definitely looks like a job you should be wearing a hardhat for tbh.
I feel as though you know how dumb this post is, as the two projects are worlds apart in complexity, but I guess you just posted it for a reaction...Huh, so in less than a year, Energylandia has built more than PL has in over two and a half years, LOL. Very interesting (and impressive), indeed.
I am well aware that F.L.Y is a prototype coaster and has an entire hotel built around it, and that is the reason it is taking so long. My post was not intended to diss on PL, but rather to point out how vastly different the projects are, in every way possible...I feel as though you know how dumb this post is, as the two projects are worlds apart in complexity, but I guess you just posted it for a reaction...
As for Zadra though, damn! Also, that entrance archway is giving me life <3
Well, its about 98% completed. There is still about 20-30m of track needed to finish all thing,If it’s opening in August do we know how much track has gone into place so far and how much is left to go in. To open on the 15th it would need to be complete by around the 1st of August for testing