http://rcdb.com/468.htm#p=4846Ian said:I don't think I've seen a coaster since Nemesis where the engineers have to be clever with the supports to match the terrain.
Cringing hell.andrus said:youtube]http://www.youtube.com/watch?v=Q818aYMAU98[/youtube]
IMAscore produced the official soundtrack of HELIX at Liseberg (Sweden) with a total duration of around 100 minutes. We're overwhelmed by the great response to the release of the station track of HELIX by Liseberg. As a "thank you" and with kind permission by the park, we hereby release another part of the soundtrack: the 20 minutes long Launch Platform track! This part features the main melody in full glory.
Screaming Coasters said:Trust you to bite on my comment. Predictable.
But ok, I'll answer you.
Its the difference between those timid wobbles, to a producer who understands EDM, like this.
http://youtu.be/5wkC8vWbFm8?t=2m18s
And you're right, I am a snob.
Smithy said:Trust you to post something stupid.
I said aside from snobbery. Why does it matter that an ''EDM Producer'' doesn't approve of the quality of a ride soundtrack at a Swedish theme park?