That looks wild, your fit won't touch the floor and the shape of the restrains´ metal part is pretty cool and slightly different from what we are used to. Also onboard audio on your head and in between all the seats! Can't tell if there are lights but I´m sure the front and back will at least have.The seats look so far off the ground! Loving the batman logo & onboard audio
The answer is almost always dynamics. The park probably wanted a more dynamic ride experience and you have to go shorter to do that.There is only one problem for me. Those trains can only carry 12 passengers each.
Why so little?
I understand your dynamics story. But why would you upgrade that, and divide capacity by almost 2?The answer is almost always dynamics. The park probably wanted a more dynamic ride experience and you have to go shorter to do that.
They are trying to provide a specific experience for their guests. And they might not be affecting overall capacity that much. The ride really isn't that long and it has several blocks, so shorter trains provide an opportunity to dispatch a higher number of trains in a quicker manner. It's not too dissimilar to Maverick which is still one of the most popular coasters in the world.I understand your dynamics story. But why would you upgrade that, and divide capacity by almost 2?
Yea but the caveat to this is that the layout ends with the train on a spike and turntable, which means that they theoretically can't dispatch the next train until the previous is completely off of the circuit.The ride really isn't that long and it has several blocks, so shorter trains provide an opportunity to dispatch a higher number of trains in a quicker manner.
That's not really true though. Each of those launches act as blocks as does the brake/turntable. A train should be cleared to dispatch by the time the train in front of it clears at least the third launch. You could have train 1 going through the stall and launch train 2 behind it from the first launch track because you have both the second launch before the top hat and the third launch before the stall to halt train 2 should train 1 not clear the turntable in time.Yea but the caveat to this is that the layout ends with the train on a spike and turntable, which means that they theoretically can't dispatch the next train until the previous is completely off of the circuit.
April 27Anyone know when we can expect this to be open?
why though? There is no official date as of right now, we only know some time in Spring, but I bet it will open sooner than that.April 27
Expect it a little bit laterApril 27