Phantasialand | F. L. Y. | Vekoma Launched Flying Coaster | 2020

Would truly be great. But I think that's far from being clear at this point.

Speaking of it, I was wondering if we could find some vague hints to guess whether it will be 2020 or 2021. For instance, is there anybody out that follows the construction closely enough to have some feeling about whether they now pursue construction in the same speed than before the Corona shutdown in February? I know it's probably hard to asses but maybe one can find some indication whether they are running the construction with full capacity or not. The thing is, if they decided to postpone opening to 2021 I could imagine that they wouldn't push for sticking to the original schedule but would reshuffle things whenever possible and economically beneficial. Any observations that help us here?
 
Speaking of it, I was wondering if we could find some vague hints to guess whether it will be 2020 or 2021.
Im am quite certain that its going to be 2021. Judging from the current state of construction, they might have planned a June/July opening like for Taron. But with the limited capacity due to Covid 19 + to minimize outgoing cashflow they appear to have it slowed down as much as they could to open in a new season. Maybe Winter 2020 if restrictions are gone, but otherwise it will most likely be 2021.

As they do not make test rides anymore, I assume that every ride check is complete and "TÜV geprüft", so the ride is allowed to carry guests. You don't normally plan such things half a year early, so this is a big hint for the planned opening date.
 
they appear to have it slowed down as much as they could to open in a new season.

Wait, is that something you assume or actually observe? That was my whole point...
If they have slowed down significantly, I guess I can safely abandon my hopes for this year (and consider celebrating the annual disappointment day...;))
 
Last edited:
These are mostly minor works. Installing a lamp does not take much time, neither does the placement of the zeppelins. We do not know about the state of the hotel on the inside, but all I see is some finishing work on the outside.
The Test rides can be mostly done by the park staff and Vekoma, and Vekoma will most likely be already contracted.

From what I can observe, it looks like the park has kept the work going on what they already contracted, and did not issue any more contracts.
 
Now they’re doing this, could Phantasialand potentially have close to a full season this year, as they opened at the end of May, and don’t they usually not open until April anyway?
 
Wonder if they still intend to close River Quest as scheduled or if they're going to attempt to have it open as long as the climate allows it.
The extra 3 week opening is being marked as the “summer season”, so I would assumed river quest would be open as it’s always open during the whole summer season, and then would presumably be closed 1st day of wintertraum for maintenance.
 