Yea one side nearly shut down after a drive tire ripped, but both managed to make it through a full day
Get a German coaster
Yea one side nearly shut down after a drive tire ripped, but both managed to make it through a full day
Most likely yes, but there isn't much track so most of it is ground level work.But they have to put the station in, the active components, the water pumps and filtration - and then comes the train. I guess 2-3 months until everything is in place to start testing. And then I already see the sign "Due to late parts from Europe..."
That's sickening.$13 million
Sure, doesn't sound like it: "even without the bulk of the manufacturing bills"$13 million isn't bad at all if that's all-in.
Sure, doesn't sound like it: "even without the bulk of the manufacturing bills"
I went on Sunday and was super excited to see the cars finally inA wild Georgia Surfer train has been sighted chilling in its natural habitat;