Settlement has been reached:
https://www.yahoo.com/news/us/articles/magic-mountain-ride-manufacturer-reaches-203922877.html
Not to make light of this situation because no one should ever have to question their safety when boarding a roller coaster, but the details of an incident often determine how much negative publicity a ride carries over time.
Historically, there is only a loose correlation between a serious injury or fatality and a ride being permanently closed or significantly modified. Meaningful action is more likely when there is an ongoing media narrative, a highly publicized government investigation, or regulatory scrutiny that could jeopardize a ride's certification and continued operation. Since states are responsible for overseeing ride safety and annual recertification requirements, that level of involvement tends to put additional pressure on operators.
Absent sustained public attention, parks will often keep a ride closed temporarily, conduct inspections or repairs, and then reopen it once it has been recertified. TTD and KK are good, recent examples that met different reasons for their demise, despite years of incidents involving
launch cable failures,
damaged brake components turning into shrapnel,
hydraulic fluid leaks on riders, and other well-documented maintenance/injury challenges. We did not see major redesigns or operational changes for either ride until there were either severe injury (TTD) or substantial financial consequences associated with keeping them running (KK, which was believed to cost $1M annually to run).
It feels uncomfortable to say, but large park operators often respond most decisively when safety concerns become a financial risk. Whether that pressure comes from legal exposure, regulatory action, lost attendance, or negative publicity, meaningful changes frequently happen only when the cost of maintaining the status quo exceeds the cost of fixing the problem.
Back to X2 and SFMM, I will be curious how the State of California responds to this, and if there's more formal investigation launched to the ride before it reopens. The timing of the new Vekoma flyer also airs in SFMM's favor, as it will change focus and media attention, and take eyes off of X2.