What's new

Energylandia's Future Additions

The RMC looks heavily inspired by Goliath.

And I'm about 75% sure that that Vekoma launch coaster is a Shockwave model, based on the pictures and the fact it has 5 inversions.
 
The RMC looks heavily inspired by Goliath.

And I'm about 75% sure that that Vekoma launch coaster is a Shockwave model, based on the pictures and the fact it has 5 inversions.

The Shockwave isn't a multi launch model
 
:emoji_zipper_mouth:ing hell...

Has anyone actually been to this park? It seems like it might be a bit wishy-washy on the inside.
I went last year, in July, nice park, but they had not even finished their advertised water coaster by then, still not opened yet

Sent from my FRD-L09 using Tapatalk
 
The RMC looks heavily inspired by Goliath.

And I'm about 75% sure that that Vekoma launch coaster is a Shockwave model, based on the pictures and the fact it has 5 inversions.

Also think it looks like the shockwave model, same launch into the funny twisting top hat and loop.

Whoever is making the decisions in this park is doing a pretty decent job! Building the foundations to be one of the best coaster parks in the world for sure.
 
Although it can only have one launch to be a Shockwave model, so we'll have to wait for future imagery to be sure.

I've just realized, why would they get another Vekoma launch coaster when they already have Formula?
 
Last edited:
Will the RMC be a Topper Track or an IBox Track, out of interest? You guys and Energylandia themselves seem to be implying Topper Track, but RCDB implies that it will be a ground up IBox coaster.
 
RMC have never built a ground-up I-Box before. It could be possible, but I just can't see it. I personally think it will be a topper.
 
I'd say Topper Track, just solely based on the fact it's a new product and the close resemblance with Goliath.
 
The Vekoma will NOT be the shockwave layout/model. It will be Vekomas first water coaster. OR Sanseis? :-D And if you plan a trip: I would say that one coaster will debut in 2021.
Looking forward to seeing what they come up with for their mine train and the rumoured tilt coaster...
Booth will come. The contracts are in the making. Planning 2022/23 for the mine and 2023/24 for the Tilt 2nd Gen, booth by Vekoma.
 
When will they stop? At this rate, it honestly wouldn't surprise me if either here or Ankapark reaches 20 coasters before SFMM does.
 
Turns out I might be going here in a couple of weeks. WTF is going on with the water coaster? Anyone have a clue?
 
Top