^Courtesy of Dex
View of the sound barrier wall along the back of Maus au Chocolat from the bridge above the Berlin entrance.
- New supports and track connecting the curve up through the steel towers beside Wuze Town and the track section that eventually leads into the second launch.
Confirming that the Zero-G Roll, still the tallest part of the layout so far, over the building (as seen below) is part of the 1st half of the layout.
- The 1st launch has been almost entirely erected now.
Must say I like how multiple bits of track wrap around above and below the suspended 1st launch track should provide some nice near misses.
- View of the end of that new section leading into the tunnel under/through that building.
- Blue tarpaulins in the launch tunnel showing that theming work is still taking place.
- There appears to be a quite a bit of build material and a couple drums of cable sitting around. A lot of activity on site.
Metal ducts of some kind have been attached to the bottom right wall as well.
EDIT: Wuze Wall! From PhantaFriends.de user PasXal.
^ Decorative element visible from the top of the building that the wall sits on top of.
This building and the two large arches in the pictures above are not finished. Presumably this will happen in the coming weeks. Or perhaps in the main off-season (January to April) as they need to remove the construction fences and advertising banner infront to better access it.
The corner at Wuze Town is now complete (mostly). The crest design has been shrunk here to make space for the gateway below into Rookburgh (not visible due to the tarpaulins).
You can also see how they've connected and blended together the stone work to the Wuze Town building to close up the gap here.