CSLKennyNI
Giga Poster
So yeah the dragon wings emblem of Air Rail with the pilot's badge F.L.Y. logo on the front. And on the bumper is the train number (4).
Under the curved block of hotel rooms left of the gateway - its the hotel lobby from the side. Guests enter through the portal then turn left and walk into the lobby.
So a friend just told me that “Fly” will open on the 7.09.2020 , but only for the employees at first , a bit testing and stuff like this. But he do not no know when it will be opened for the normal visitors.
Any chance your friend can hook me up to ride on 7th September. ??So a friend just told me that “Fly” will open on the 7.09.2020 , but only for the employees at first , a bit testing and stuff like this. But he do not no know when it will be opened for the normal visitors.
Because he also told me the exact date , when „Crazy Bat“ opened last Year.And why should we trust him?